General Contracting
Garage Ramp Construction at 25 Mabelle Avenue

Client
North Edge Properties Ltd.
Location
25 Mabelle Avenue, Toronto
Overview
The 25 Mabelle Avenue Garage Ramp Construction project involved the complete construction of a new parking garage ramp and associated site improvements to enhance vehicle access, durability, and long-term performance. The scope included earthworks, asphalt paving, cast-in-place concrete sidewalks and retaining walls, concrete rehabilitation, waterproofing systems, expansion joints, drainage upgrades, lighting, architectural coatings, steel railings, overhead doors, landscaping, and all related finishing works.
Our Approach
Our team executed the project through a coordinated, phased construction plan that integrated structural, civil, waterproofing, and finishing activities while maintaining strict quality and safety standards. By carefully sequencing concrete repairs, waterproofing installations, drainage systems, paving, and final architectural finishes, we delivered a durable and fully integrated garage ramp system designed to withstand heavy traffic, protect the structure from water infiltration, and provide long-term reliability with minimal maintenance.







